Afritech CAD Design @ 2013

Website Designed by: AFRITECH CAD DESIGN

CAD Designers - Gaithersburg, MD

Afritech has the capability to perform project planning and management by performing a thorough project study/analysis and evaluation to produce a realistic and feasibility plan to bring the project to fruition.


We work with both

General Contractors and Sub-Contractors, and Construction Crew, of small businesses.


No job is too small for Afritech engagement,


be it a window repair, bathroom remodeling, deck repair, painting job, building facade enhancement, existing tenant improvement like addition of closets, floor repair, house/building design etc.

CONSTRUCTION COST ESTIMATING AND SCHEDULING

Service Fees

$ 500 for area under

1000 sft.


$ 1000 for area over

2000 sft.


$ 2500 for area over

5,000 sft. up to 10,000 sft


$1/sft. For larger areas

SUB-CONTRACTORS

GENERAL CONTRACTORS

Additional SERVICES at an additional fee


(Range $1/sft for area over 2000 sft.)

to

($2sft for areas under 1000 sft.)


(Areas between 1000 -2000 sft = $2000)


Scope Alignment

Selecting subcontractors for different pieces of work


Construction Bidding


Bid Solicitation from subcontractors within the project locality and with capability to perform work within the specification details


Project Buyout


The process of converting all material/ subcontracts bids/quotes into contracts and all quotes to purchase orders or purchase contracts.  


Sub-Contractors Scheduling

Schedule ‘of subs’ on the jobsite.

Service Fees

$ 300 for area under

1000 sft.

$ 500 for area over

2000 sft.

$ 1250 for area over

5,000 sft. Upto 10,000 sft


$0.50/sft. For larger areas

RATES FOR LINEAR WORK

Small Jobs

Medium Jobs

Large Jobs

Very Large Jobs

% percentage

5%

3%

2%

1.5%-1%

Range

$5,000 and less

$10,000 - $ 50,000

$75,000 - $ 200,000

$300,000 - $ 500,000

PROFESSIONAL

SERVICES

PROPOSED FEES STRUCTURE OF ENGAGEMENT

Bill of Materials


Work-Breakdown Structure (WBS)


Construction Cost Estimate


Materials/ Labor/

 Equipment

$

 Subcontracts


Margins-


Contingency Costs & Overheads/ Profits


Project Reports


Gantt Chart


 Schedule of Values


Project Scheduling